Parco-Sinclair Theater

The theater was shuttered for decades. The project consists of renovations to the 1924 historic building, a contributing -- and arguably most important -- building in the National Historic District in the downtown of Sinclair. The project includes a fire protection system, fire alarm, refurbished historic light fixtures, historic plaster repair, historic wood trim refinishing, historic windows, storm windows, historic exterior stucco repairs, replacement replica theater seating, stage curtains, sound system, projector and rigging - to accommodate the building's renewed use as a multi-use thatrical venue and included assisted listening for the hearing impaired. The floor of the theater was re-poured to meet modern ADA accessibility along with new ADA restrooms and concession/catering kitchen.

Boxing Images

 

 

Location
Sinclair, Wyoming

Owner
Town of Sinclair
Monte Thayer,
Community Events Director
307-324-3058

Owner's Representative
Edge Engineering
Jason Knopp
307-797-1224

Contractor
Richardson Construction
Randy Richardson, President
307-635-6166

Shepard Construction Solutions (stucco)
Troy Shepard
307-328-1059

Role
Project Architect
Interior Design

Personnel
Lyle Murtha, Principal Architect

Scope
Renovation/Historic Preservation

Size
4,553 Square Feet

Cost
$1.8 million
$300,000 (stucco)

Completed
2022
2024 (stucco)